Close Menu
Tech News VisionTech News Vision
  • Home
  • What’s On
  • Mobile
  • Computers
  • Gadgets
  • Apps
  • Gaming
  • How To
  • More
    • Web Stories
    • Global
    • Press Release

Subscribe to Updates

Get the latest tech news and updates directly to your inbox.

Trending Now
Kate Bishop Actress Hailee Steinfeld in Avengers: Doomsday Confirmed

Kate Bishop Actress Hailee Steinfeld in Avengers: Doomsday Confirmed

23 November 2026
We haven’t seen the last of the major tech outages

We haven’t seen the last of the major tech outages

23 November 2026
GTA 6 Dev Honors Late Mother With In-Game Memorial

GTA 6 Dev Honors Late Mother With In-Game Memorial

22 November 2026
Facebook X (Twitter) Instagram
  • Privacy
  • Terms
  • Advertise
  • Contact
Facebook X (Twitter) Instagram Pinterest VKontakte
Tech News VisionTech News Vision
  • Home
  • What’s On
  • Mobile
  • Computers
  • Gadgets
  • Apps
  • Gaming
  • How To
  • More
    • Web Stories
    • Global
    • Press Release
Tech News VisionTech News Vision
Home » A Power Provider for Meta Urged Regulators to Exempt Data Center Plants From Acid Rain Rules
What's On

A Power Provider for Meta Urged Regulators to Exempt Data Center Plants From Acid Rain Rules

News RoomBy News Room23 November 2026Updated:23 November 2026No Comments
Facebook Twitter Pinterest LinkedIn Tumblr Email
A Power Provider for Meta Urged Regulators to Exempt Data Center Plants From Acid Rain Rules

Williams, a provider of gas power to several Meta data centers, met with Environmental Protection Agency leaders in the period leading up to the agency’s recommendation to waive acid rain regulations for data-center power plants, documents obtained by WIRED show.

The oil and gas infrastructure company’s private discussions with the agency come as the Trump administration loosens a number of environmental requirements for data centers and the natural gas plants being built to power them.

“The administration is trying to relax, if not suspend for all intents and purposes, a range of regulatory requirements for these data centers,” says Joseph Goffman, the former assistant administrator at the EPA’s Office of Air and Radiation. “What this administration is trying to do, either explicitly or de facto, is take layers [of regulatory protections] away.”

In response to a list of questions from WIRED, Williams spokesperson Alex Schott said in an emailed statement that the company “is committed to developing energy solutions to enhance America’s position in the global competition for AI, while prioritizing environmental protection—including addressing legislation and regulations to modernize construction and implementation timelines.” Meta declined to comment.

In July, the EPA announced new federal guidance for states around participation in the Acid Rain Program, following inquiries from “companies and States.” The decades-old program was designed to reduce harmful emissions of chemicals that cause acid rain. Power plants that fall under the program need to submit a permit application two years before a facility comes online, and then regularly monitor emissions to ensure compliance.

That month, the EPA said that it recommends that “islanded” power plants—which are increasingly being adopted by data centers across the country—be exempt from the program. Because the program was designed for facilities that sell electricity to the grid, the EPA said, power plants that exclusively power data centers wouldn’t need to comply.

Documents obtained by WIRED from the EPA show that Williams was one of three private companies that asked regulators for guidance on the program.

In a February letter sent to the Utah Department of Environmental Quality and obtained by WIRED, Williams director of permitting Steve Hall wrote that the “current regulatory uncertainty” around power plants being built solely to power data centers has created “obstacles … for data center development in the United States.” The EPA confirmed to WIRED that Williams sent the agency this letter.

Hall wrote that the company believed its power plants “are not subject to the Acid Rain Permit program requirements, as this program was never intended to apply to sources that do not sell power to the public grid.” Getting federal guidance, he wrote, would “accelerate deployment of critical infrastructure” and “support national goals for digital infrastructure and energy reliability in the global AI race.”

The EPA said in its July announcement that the new guidance was in keeping with orders from the White House to encourage data center developers to build their own power, in order to avoid increasing utility rates for consumers. However, data center developers are also increasingly turning to private power because it’s often quicker to build their own infrastructure than wait for a grid connection. These private power plants often create more emissions than many of their on-grid counterparts.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

Related Posts

Trump removes US cyber director following wave of technology outages

Trump removes US cyber director following wave of technology outages

23 November 2026
Kodak’s next collectible is a tiny digital photo frame that doubles as a tracker

Kodak’s next collectible is a tiny digital photo frame that doubles as a tracker

23 November 2026
We haven’t seen the last of the major tech outages

We haven’t seen the last of the major tech outages

23 November 2026
Apple HomeView audio review: Good sound, weird CarPlay apps

Apple HomeView audio review: Good sound, weird CarPlay apps

22 November 2026
Editors Picks
Trump removes US cyber director following wave of technology outages

Trump removes US cyber director following wave of technology outages

23 November 2026
GTA 6 Appears to Him as ‘as a Bugatti Veyron Would to a Nervous Victorian Child’

GTA 6 Appears to Him as ‘as a Bugatti Veyron Would to a Nervous Victorian Child’

23 November 2026
Sunrise on the Reaping Plows Through GTA 6 Hype With 5 Million Opening Weekend

Sunrise on the Reaping Plows Through GTA 6 Hype With $225 Million Opening Weekend

23 November 2026
Kodak’s next collectible is a tiny digital photo frame that doubles as a tracker

Kodak’s next collectible is a tiny digital photo frame that doubles as a tracker

23 November 2026

Subscribe to Updates

Get the latest tech news and updates directly to your inbox.

Trending Now
Tech News Vision
Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
  • Privacy Policy
  • Terms of use
  • Advertise
  • Contact
© 2026 Tech News Vision. All Rights Reserved.

Type above and press Enter to search. Press Esc to cancel.